by Christian Spiteri | Nov 29, 2024 | Uncategorized
As part of Malta’s long-term climate and energy goals to reduce carbon emissions from the energy sector, enhance the integration of renewable energy sources (RES), and strengthen the security of supply, the country is launching the procurement process for the design...
by Christian Spiteri | Nov 14, 2024 | Uncategorized
Sicily, officially the Regione Siciliana, has given its go-ahead for Malta to develop its second interconnector (IC2), which will strengthen the island’s network connection with mainland Europe. This formal approval, known as the Intesa Finale, marks an important...
by Christian Spiteri | Nov 5, 2024 | Uncategorized
A Prior Information Notice (PIN) has been issued for the manufacturing and installation, including civil works, of a 132kV, 50-120MVAr variable shunt reactor at the Maghtab Terminal Station in Malta. This notice follows the series of tenders required for the...
by Christian Spiteri | Sep 28, 2024 | Uncategorized
Interconnect Malta has reached a major milestone in the development of Malta’s second electrical interconnector (IC2) with the recommendation for award of a €34.2 million contract for the manufacture and installation of onshore cables. Following a detailed evaluation...
by Christian Spiteri | Aug 23, 2024 | Uncategorized
Interconnect Malta has initiated a geographical survey of specific areas within Malta’s Exclusive Economic Zone (EEZ). Fugro Italia Spa is carrying out the survey, which aims to map the bathymetry, locate and identify seabed and man-made features, and gather...