Interconnect Malta (ICM) is starting the offshore works of the preliminary marine route survey (PMRS) for Interconnector 2, the second submarine electricity cable between Malta and Italy.
Although the distance of the route is circa 100km, during the execution of the survey activities the vessels will capture over 5,000km of survey lines to provide enough data for the next project phases, namely, the design and the permitting.